In the San Matías Gulf, in Argentine Patagonia, Argentina LNG, the largest gas project in the country’s history, is moving forward. Its public hearing takes place on November 16 in Sierra Grande, and the investment decision has already been announced for November 26. We are being asked for our opinion on a project they have already decided.

This is how every fossil project in the gulf has advanced: the oil pipeline, the LNG vessels and the gas pipeline all went through hearings that excluded communities, with police at the door, objections that were never taken into account, and no consultation with the Indigenous peoples whose territories they cross. They also put at risk Península Valdés, a UNESCO World Heritage Site.

Argentina LNG still needs billions of dollars from international banks and agencies, and they can say no.

No consultation, no social license. Write to them today and ask them not to finance Argentina LNG.

Want to reach out to us?

You can do it at golfoazulparasiempre@gmail.com

This what the financial institutions will receive:
I am writing to you because your institution is reportedly involved in, or considering, the financing of Argentina LNG, the liquefied natural gas export project led by YPF, Eni and XRG (ADNOC) in the San Matías Gulf, Río Negro province, Argentina. With an estimated investment of US$51 billion, it is the largest project in the country’s history. It includes expanded fracking in Vaca Muerta, gas pipelines, a liquids pipeline, an industrial complex and two floating liquefaction vessels of 6 million tonnes a year each, off the coast of Las Grutas.

I am writing to warn you that the project is moving forward without a social license, through participation processes that do not meet Argentina’s national and international obligations or the standards your institution applies.

On November 16, 2026, the public hearing for Argentina LNG will take place in Sierra Grande [1]. Four separate environmental impact studies will be reviewed in a single day: gas pipeline, floating liquefaction units, liquids pipeline and industrial complex. Only Río Negro residents may register, each speaker has five minutes, and the fracking that will supply the project is left out of the assessment. The final investment decision has already been announced for November 26, just ten days later [2].

This is the fifth hearing on fossil fuel infrastructure in the gulf since 2023, and all of them repeated the same failures:

  • Vaca Muerta Oil Sur (VMOS) oil pipeline, Sierra Grande, August 2023. Only Río Negro residents could take part, although the project crosses Neuquén and affects Chubut [3]. The environmental impact study, about 4,500 pages long, was published as a scanned document that was hard to read. Registered participants who opposed the project were denied entry and left written statements saying so [4]. Police intervened, and a member of the Curru Leufú assemblies was forcibly removed after demanding that others be let in.
  • Southern Energy’s first LNG vessel, San Antonio Este, December 2024. The provincial officials in charge of the assessment opened the hearing by publicly backing the project [5]. Organizations such as FARN and the Argentine Association of Environmental Lawyers warned that the study did not assess cumulative impacts with VMOS or estimate greenhouse gas emissions. None of these observations was taken up.
  • Second LNG vessel, San Antonio Este, September 2025. The expansion more than doubled liquefaction capacity in the gulf, yet it was assessed on its own [6]. The same objections were raised again with no response, and the government declared the same day that “social consensus” had been ratified [7].
  • Tratayén–San Antonio Oeste dedicated gas pipeline, May 2026. The company’s own schedule set the start of works for that same month [8], meaning citizens were consulted after the decision had been made. The government again presented the outcome as “strong social consensus” [9].

None of these processes assessed the cumulative impacts of an interconnected infrastructure system: an oil pipeline, an oil terminal with monobuoys, several gas pipelines and four liquefaction vessels in the same gulf.

None of the projects in the gulf has carried out free, prior and informed consultation with the Mapuche and Mapuche-Tehuelche communities whose territories they cross. The Fvta Xayen community, whose territory is crossed by the VMOS oil pipeline and Southern Energy’s gas pipeline, asked for the 2023 hearing to be suspended and for a prior consultation, and received no response. The Kintul Folil community in Sierra Grande and the Coordinadora del Parlamento Mapuche Tehuelche denounced the same omission.

In June 2026, the ILO Governing Body concluded that an environmental public hearing is not, in itself, a consultation under Convention 169. Yet the November 16 hearing is once again the only participation mechanism offered. Argentina LNG also depends on expanding fracking in territories claimed by Mapuche communities in Neuquén, such as Lof Campo Maripe, with no public record of any consent process.

These failures are incompatible with the Escazú Agreement, in force in Argentina through Law 27.566, with ILO Convention 169 and with the IFC Performance Standards that your institution applies or has committed to, in particular PS1 (cumulative impacts), PS6 (critical habitat) and PS7 (Indigenous Peoples).

The San Matías Gulf forms a single bioregion with Península Valdés, a UNESCO World Heritage Site. Spill modeling shows oil could reach ten protected areas within days [10], and the southern right whale uses the entire gulf as a calving ground [11]. The World Heritage Committee keeps the case open until 2027, and IUCN has adopted a resolution on the environmental integrity of the gulf. Related projects in the same gulf also face active litigation and growing social conflict.

Financing Argentina LNG means taking on significant legal, social and reputational risks. I therefore ask you not to finance Argentina LNG. We want our Blue Gulf forever.